Maritiem Media is uitgever van het Duurzame Scheepvaart MGZN.

Home 5 Persberichten 2021 5 TETRASPAR FLOATING WINDTURBINE: MISSION ACCOMPLISHED!

TETRASPAR FLOATING WINDTURBINE: MISSION ACCOMPLISHED!

TetraSpar floating windturbine-mission accomplished

Last August, Bourbon Subsea Services completed the installation of the TetraSpar Demonstrator floating wind turbine at the Metcentre test site in Norway: the power supply cable for the 3.6 megawatts turbine was laid and
connected for entry into service these next weeks.

In June, the Bourbon Subsea Services teams had already installed the mooring lines before ensuring towing and connection operations one month later.

The video below will enable you to discover the operation from behind the scenes and explains the challenges of this project, which is of great interest for the entire floating wind turbine industry.

WATCH HERE THE INSTALLING TETRASPAR DEMONSTRATOR
Discover how an innovative Floating Wind Turbine like TetraSpar Demonstrator is installed off Norway, behind the scenes… This is the 5th Floating Wind Turbine (FWT) project Bourbon Subsea Services has been awarded since the company decided to develop its activities towards renewable energy in 2011.

Misschien hebben deze berichten ook je intresse…..